Saturday, May 16, 2009

Halfway Mark for Shower Tiling

I hit the hard part of the shower tile installation.Even though I tried to space the niche as best I could, given the lack of space between wall studs, I'm having to cut--and break-- a bunch of L-shaped tiles.

In the meantime, the tub hardware looks good, and enough of the tile is up that we can bathe, just not shower.
I only have edging started on one of the sides, since the other wall needs to be evened out at the edge, but what's up looks pretty good.

No comments:

Post a Comment