Monday, October 17, 2011

Caulk 'n' Cabs

I spent Saturday with a razor blade in hand, scraping blue tape covered in dried thinset and grout from between the countertop and backsplash. Sunday brought caulking, which went smoother than my past caulk adventures.
With the final step in the tiling done, Ryan finished plumbing the sinks.
We put the final strips between the cabinets, so I started unpacking, washing, and organizing everything that goes into the kitchen cabinets.
The under cabinet trim still needs to go on, but that's pretty minor.

No comments:

Post a Comment